Langen & Sondermann GmbH & Co. KG

News

IRIS Certification:

As one of the first companies ever Langen & Sondermann has achieved the IRIS-certification according to the new revision 02! During an audit conducted by Bureau Veritas between January 11th and 13th, 2010 was assessed that Langen & Sondermann fulfills the requirements of the IRIS-standard Rev. 02. This means conincidentally that the quality management system is certified according DIN EN ISO 9001:2008. Both certificates can be downloaded in the Downloads area.

Latest Press Report:

Westfälische Rundschau 02.01.2010:

Pressemeldung Westfälische Rundschau 02.01.2010Download of press report in the local newspaper "Westfälische Rundschau" dated 02.01.2010 as pdf-file (only in German language).












 

Exhibitions:

2009:

L&S-Stand Business on Rails 2009Langen & Sondermann has presented between November 10th to 12th, 2009 in Sao Paulo, Brasil, together with 21 other companies of the railway industry and research institutions a joint booth at the Business on Rails Show. The trade fair took place in the Red Pavilion of the Expo Center Norte. The event is the largest specialized railway engineering exhibition in Latin America. The 22 exhibiting companies included specialised suppliers of railway engineering components and subsystems. The joint booth at the trade fair was supported by the German Federal Ministry of Economics and Technology (BMWi) in cooperation with the Association of the German Trade Fair Industry (AUMA) The feedback of the professional visitors was very good and also for Langen & Sondermann the trade fair appearence was profitable as many new contacts could be established.

2010:

Stand Innotrans 2008Certainly Langen & Sondermann will also again be at the "Innotrans 2010" September 21st-24th, 2010 with an own exhibition stand. You will find us in Hall 6.2, Booth 107. Please visit us there for qualified technical and commercial talks and enjoy our usual excellent service with food and beverages.









Latest News:

New production hall Meanwhile we have managed it finally: The extension to the production building is finished. The first facilities have already been moved there. The enlargement of the production area by 10% gives us the possibility to increase our capacity for parabolic springs and their refurbishment to meet the requirements of the market.